In my work we have a SC 4.1.1 working with P4 file, previously we've got a shadow with a oracle 8.1.7 working, but for problems with server the admins decide to delete the shadow. Now I wanna remake the shadow with P4 but not with the oracle 8, with Oracle 9.
It's possible SC 4.1.1 server to work with oracle 9.2?.We only want remake the shadow to release reports with Crystal reports.

thanks

helpdesk